SolidBlack HD-TPO (with Moisture Barrier Lip & Tape) - Installation Instructions

SolidWalk LT with Moisture Barrier, Lip and Tape
2) Start in a corner. Unroll SolidChoice LT underlayment over subfloor with vapor barrier film (Logo Imprinted Side) down against subfloor. Be sure tape strip side is next to the wall and overlapping lip is toward the open room.(print)

Flooring ProductsCustom FabricationTapeAdhesivesLoose FillPackagingwww.pliusa.com
Welcome to PLI (Pak-Lite)
Contact Us | Site Map | Home